Synchronize re-sending jobs in sendPendingExperimentData() and modifying
(or indirectly, via getDone() and the campaign, deleting) jobs in the
m_runningJobs queue.
a) sendPendingExperimentData needs an intact job to serialize and send it.
b) After moving the job to m_doneJobs, it may be retrieved and deleted
by the campaign at any time.
Additionally, receiving a result overwrites the job's contents. This
already may cause breakage in sendPendingExperimentData (a).
git-svn-id: https://www4.informatik.uni-erlangen.de/i4svn/danceos/trunk/devel/fail@1943 8c4709b5-6ec9-48aa-a5cd-a96041d1645a
Fix 1: A result message with a nonexistent or invalid run ID must be
ignored in any case. 0 is only OK for NEED_WORK messages, clients
communicating a result must know the ID.
Fix 2: Tell the client the run ID in the first place ...
git-svn-id: https://www4.informatik.uni-erlangen.de/i4svn/danceos/trunk/devel/fail@1692 8c4709b5-6ec9-48aa-a5cd-a96041d1645a
A campaign server now tells all clients a unique run ID (the UNIX timestamp
when it was started). This allows us to ignore results from "old" clients
that talked to another server before, and to tell them to die.
git-svn-id: https://www4.informatik.uni-erlangen.de/i4svn/danceos/trunk/devel/fail@1677 8c4709b5-6ec9-48aa-a5cd-a96041d1645a
The FailBochs client is not linked by the Bochs build system anymore, but
by our cmake scripts (make fail-client):
- All Bochs libraries are merged into libfailbochs.a (a new target
within the Bochs Autotools scripts).
- The previous libfail.a is *not* a merge of all Fail* libraries anymore,
but pulls these in via library dependencies.
Additionally I did a lot of build system cleanup, e.g. additional external
libraries may now be pulled in where they're needed.
git-svn-id: https://www4.informatik.uni-erlangen.de/i4svn/danceos/trunk/devel/fail@1390 8c4709b5-6ec9-48aa-a5cd-a96041d1645a